Panel Boards
supplier in Saudi Arabia
Main distribution boards, sub-main boards, final distribution boards, MCC panels and control panels, built by us to your single-line diagram. Built to the form of separation, IP rating and switchgear brand on your specification, and delivered across Saudi Arabia.
Distribution boards
Main, sub-main and final distribution boards, from the incomer at the transformer to the last lighting circuit, built to your single-line diagram.
MDB · SMDB · DB
Every level
Form 1 to 4
Separation
Explore panel boards.
See every board ›Main distribution boards
The first board after the transformer, with the main incomer.
Sub-main boards
Feed each floor, area or building from the MDB.
Final distribution boards
Feed the lighting and small power circuits.
MCC panels
A starter for every motor, fixed or withdrawable.
Control panels
The controls and wiring your design calls for.
Pump control panels
Starters and controls for pump sets.
Choose your form.
Tap a form of separation to see what it splits inside the board. The forms are set in IEC 61439-2 and named in most panel specifications.
Form of separation
What is separated
Busbars are separated from the functional units
F2
Sub-forms
In b, the terminals are separated from the busbars too
2a · 2b
Often specified for
Sub-main boards
No single-line diagram yet?
Send us the load list ›Form 2 · IEC 61439-2
Busbars separated
Busbars
Unit 1
Terminals
Unit 2
Terminals
Unit 3
Terminals
Green lines show where the board is separated.
The form on your specification decides the build. Send it with the single-line diagram and we quote the board to it.
Get a price on WhatsAppWe confirm the build and price before we start.
MDB, SMDB or final board?
ACB
Typical incomer
MCCB
Typical incomer
MCCB or MCB
Typical incomer
After the transformer, in the main switch room
Where it sits
On each floor, area or building
Where it sits
Next to the loads it serves
Where it sits
Sub-main boards and large loads
What it feeds
Final boards and motor loads
What it feeds
Lighting and small power circuits
What it feeds
Fixed or withdrawable?
Withdrawable units.
Each starter or feeder slides out on its own, so a faulty unit can be swapped while the rest of the board stays in service. The usual choice where a motor cannot wait for a shutdown.
Ask for a withdrawable MCC ›Fixed units.
Each unit is bolted in place and wired straight to the busbars. Simpler and lower in cost, for boards that can be shut down for maintenance.
Ask for a fixed board ›Finish the system.
Shop online ›The full range.
Request a quote ›Tap any board to ask for a price on WhatsApp. Or send the single-line diagrams for the whole project, and we price every board together.
Distribution boards
MDB
Main distribution boards
The main incomer and the outgoing feeders for the whole building or plant.
Ask for a price ›SMDB
Sub-main boards
Take a feeder from the MDB and split it for a floor, area or building.
Ask for a price ›DB
Final distribution boards
Feed the lighting and small power circuits, with MCBs and RCDs.
Ask for a price ›Motor and control panels
MCC
MCC panels
A starter for every motor on the schedule, in fixed or withdrawable units.
Ask for a price ›Control
Control panels
Built to your control drawings, with the devices and wiring they show.
Ask for a price ›Pump
Pump control panels
Starters and controls for pump sets, built to your schedule.
Ask for a price ›Built to the standards on your spec.
Send the specification with the single-line diagram. We build the board to the form, IP rating and switchgear it names, and tell you straight away if anything on it needs checking.
IEC 61439-1
General rules
The general rules for low-voltage switchgear and controlgear assemblies.
IEC 61439-2
Power assemblies
Power switchgear and controlgear assemblies, including the forms of separation.
IEC 61439-3
Distribution boards
Distribution boards that ordinary people may operate, such as final boards.
IEC 60529
IP ratings
The IP code: how well the enclosure keeps out solids and water.
Why Al Barq builds your panel boards.
Approved by Aramco, SEC and NWC.
Al Barq United Trading Co. is an approved supplier to Saudi Aramco, the Saudi Electricity Company and the National Water Company, and is ISO 9001 certified. We build boards for the plants, substations and buildings those approvals cover.
Switchgear on the shelf.
Breakers, drives and controls in stock in Jeddah, ready for your board.
Walk in and ask.
Al Aziziyah District, Jeddah. Saturday to Thursday, 8:30 to 1:30 and 4:30 to 8:30.
Questions, answered.
Can't find your answer? Send us your single-line diagram and we will come back with a quote.
Contact sales › Where can I get electrical panel boards built in Saudi Arabia?
At Al Barq United Trading Co. in Al Aziziyah District, Jeddah. We build main distribution boards, sub-main boards, final distribution boards, MCC panels and control panels to your single-line diagram, and deliver across Saudi Arabia. Send your diagram on WhatsApp at +966 58 144 4604 for a quote.
What are forms of separation?
They are set in IEC 61439-2 and describe how the inside of a board is divided. Form 1 has no internal separation. Form 2 separates the busbars from the functional units. Form 3 also separates each unit from the others. Form 4 also separates the outgoing terminals of each unit. Each form from 2 to 4 has an a and a b version.
Which form of separation do I need?
The one on your specification. Higher forms let more of the board stay live while one part is worked on, and cost more to build. If the specification does not say, tell us how the board will be used and we suggest one.
What IP rating does my panel need?
It depends on where the board goes. The IP code in IEC 60529 gives two digits: the first for dust and solids, the second for water. A board in a clean, dry electrical room needs less protection than one outdoors or in a dusty plant. Tell us where it goes, or the IP rating on your specification.
What do you need to quote a panel board?
The single-line diagram, the form of separation and IP rating, and the switchgear brand on your specification. If there are limits on the size of the board or where the cables come in, send those too.
Fixed or withdrawable MCC?
Withdrawable units slide out, so a faulty starter can be swapped while the rest of the board stays in service. Fixed units are bolted in and cost less, for boards that can be shut down for maintenance. Tell us which your specification calls for.
Do you deliver panel boards outside Jeddah?
Yes. We deliver across Saudi Arabia, including Riyadh, Dammam, Jubail, Makkah, Madinah, Tabuk and Abha. Tell us where the board is going when you send your diagram.
Need a board built?
Send us three things. We come back with a quote.